Back to Barchester Towers Railway home page.
There was some time to spare on Christmas Eve while the adults prepared for the party. As the rails and most of the deck on the restored Bridge 3 were complete, these two found that they could drive over the disused track beyond the bridge workings until stopped at a collapsed tube rail just before Bridge 5.
Scrapbook -
First.
Last,
Next.
December 2023
Xavier and Ali-mae almost reaching Bridge 5
Children visiting for the Christmas school holidays were the reason to put the light rail vehicle (i.e. modern tram) back on the rails. The Sydney trams have ten sections: end, suspended, middle, suspended, end, end, suspended, middle, suspended, end. So far we only had three sections.
All the deck down and ready for painting.
Back to the main page: BTR. This page is: http://dazed.org/btr/2024/scrpbk24.htm (Page 15: 2024).
Scrapbook -
First.
Last,
Next.